We have began to visit the little block of land beside the sea each week, as development is beginning to move rather swiftly now that the concrete slab and foundations are down.

Once the concrete slab had cured, and with modern technology, cement cures within a few days, so the termite shield and waterproofing can then be installed. From then, the timber frame can be erected.

Construction methods have changed immensely since the day that my Builder Father-in-law used to knock up homes in six weeks with a team of three.

Houses are larger and timber frames comes in pre-fabricated pieces. A Nail gun secures everythin in place in one day. The bottom storey was completed in just one day.

It is an exciting time, seeing all the preparations and plans emerge from the soil and take shape in front of your eyes. It is kind of like a young child growing up all too fast.

The second storey is due for completion today and the roof will be installed next week.

Looking good.

1 thought on “Framing a Storey”

I love a good discussion. What do you have to say?

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s